Sökresultat:
4052 Uppsatser om Stage project - Sida 1 av 271
ÄTA-arbeten på Trafikverket
?ÄTA-work? (Changes, Supplementary and Retiring works) is more or less common in all construction projects whether it is about houses, roads or railways, in the planning stage, or in the construction stage. For the Swedish Transport Administration, which is the largest purchaser of infrastructure in Sweden, ÄTA-work is a hotter topic than ever.Economists and managers want to draw conclusions on the projects share ÄTA-work, while the project manager is concerned about whether it is possible to draw any conclusions at all as each project is unique in itself and has its own merits. There is a big variation in the amount of ÄTA-work in different geographic districts in the Swedish Transport Administration.This study shows that the Swedish Transport Administration does not have a unanimous approach regarding the management of ?ÄTA-work?.
Avbördningsekvationer för sjöar utan vattenföringsmätningar
Stage-discharge equations for lakes without disharge measurementsSimon AnderssonIn 2015 all lakes, rivers, coastal water and groundwater should be of good ecological statusaccording to the water framework directive from the European Union. In the process ofimproving the quality of Swedish water bodies, knowledge of where problems occur isneeded in order to utilize the resources optimally. The ability of lakes to store water is animportant factor since it controls the flow of water through the country. A stage-dischargeequation is a mathematical relation between discharge from a lake and its water level. Bybetter understanding of stage-discharge equations for lakes, their storage capacity can bedescribed better in hydrological models.This master thesis aims to evaluate methods for determining stage-discharge equations forlakes where a variable amount of field measurements is available.
Scenografi till Batboy - the musical
This is the project of making a stage design for Batboy ? the musical, a cooporation with a network of musical artists. The aim of the project was to create a space on stage that strengthens and expands the experience of the story told, and find design solutions that give an extra dimension to the story. The prerequisites for my work were partly defined from the produc¬tion, as were my limitations. In the cast of ten artists some were to play more than one role, often one of the opposite sex.
Nyckelfaktorer för en designs slutskede
The final stage of a designers work is always a bit tricky. Design is an abstract phenomenon and no one can tell when a design is really finished. The design process that designers work within has been thoroughly studied but cannot be truly mapped with strict constraints which the designer can follow to succeed. Therefore, in this paper we take a look at the final stage in the design process. The main goal is to get more knowledge and highlight key factors about what designers face when they are about finish their design or what forces them to leave a project that can stay in development for eternity.
Driftkostnadsanalys i väginvesteringsprojekt
During its lifetime, a road goes through a number of different stages; pre-study,inquiry of the road, work plan, documenting stage, building stage and operatingstage. The operating stage is the one that takes the longest time and costs themost. Those have a tendency of becoming unnecessarily high because the projectengineers don?t always take the management and maintenance prerequisites intoconditions.To decrease the management and maintenance costs, the Swedish RoadAdministration SouthEast has been in need of a work procedure that makes theroaddesign engineers take the management and maintenance of the road intoconsideration. This shall be achieved by a checklist where the most commondesigns that lead to increased management- and maintenance costs are compiledand listed.Through interviews with project leaders in management, the most commonproblems have been identified, analyzed and summarized under the headlineswinter-road, vegetation, road equipment and road designs.To elucidate the problem from several points of view, interviews wereimplemented with project leaders in investment and roaddesign engineers.
Hus på väg : En kostnadsstudie över flyttning av tre enfamiljshus
This thesis treats Building Information Modeling, BIM, in the production stage. Brieflydescribed BIM is virtual model of a building object where all information about theobject is gathered. All the involved operators in the construction project have access tothe model and can gather or share information about the project. There are several waysto apply BIM in the production stage. This thesis primarily deals with visualization of theobject, preparation and planning, the ability to take amounts from the model andcoordination and clash control.The basic issue was highlighted by Byggdialog AB.
BIM i produktionsskedet
This thesis treats Building Information Modeling, BIM, in the production stage. Brieflydescribed BIM is virtual model of a building object where all information about theobject is gathered. All the involved operators in the construction project have access tothe model and can gather or share information about the project. There are several waysto apply BIM in the production stage. This thesis primarily deals with visualization of theobject, preparation and planning, the ability to take amounts from the model andcoordination and clash control.The basic issue was highlighted by Byggdialog AB.
Optimeringsflöde av modelleringsprogram vid broprojektering : Analys av de tre modelleringsprogrammen Tekla Structures, Revit 2013 och Rhinoceros
This thesis treats Building Information Modeling, BIM, in the production stage. Brieflydescribed BIM is virtual model of a building object where all information about theobject is gathered. All the involved operators in the construction project have access tothe model and can gather or share information about the project. There are several waysto apply BIM in the production stage. This thesis primarily deals with visualization of theobject, preparation and planning, the ability to take amounts from the model andcoordination and clash control.The basic issue was highlighted by Byggdialog AB.
Prestandabaserad design genomkonceptuell energianalys : Performance-based design through conceptual energy analysis
This degree project aims to investigate the potential and possibilities for conceptual energyanalyses in the early stages of the design process. Many key decisions are made in theearly stages of a project regarding the shape and orientation of the building. Conceptualenergy analyses can provide the architects with insight regarding different design option?srelative energy performance.As the demands for more sustainable buildings increases, so does the need for earlyenergy analyses. Performing analyses in the early stage requires many assumptions andguesswork which could lead to a large margin of error.The offering from Autodesk is a module in Revit Architecture/MEP and the stand aloneprogram Project Vasari (under development).
Mobilapplikation för taxibeställning : Att ta taxibeställningar till nästa steg
This report is going to be focusing on the development of a promotion page and login system for the web production company Adoreyou. The promotion page and login will be parts of a new taxi application for iPhone that lets the customer book a taxi and drivers manage the requests from the customers.Taxi application?s that let customer?s book trips are nothing new but they are constantly being explored and developed. The most common practice is to let the customer fill in from what address he or she wants to be picked up and to where he or she wants to be taken. Then the price is set in the application depending on the distance and most likely other factors like weekday and time.
Lean och värdeskapadnde sjukvården : En fallstudie
Now a day?s there is dramatic change from traditional to digital information processing in construction industry. This change can be visualized in the project concept stage where it now has accessibility to join all the data in one place. Location-based planning technique simplifies scheduling by visualizing the schedule efficiently and has many advantages such as might shortened the project period by about 10 - 20 % if the company uses location-based technology, reducing risks in many ways by maintaining production continuity and identify collisions between things etc. Vico Office software has been used for Location based planning technique and in this thesis.The purpose of this thesis work was to demonstrate how location -based planning technology change the scheduling stage in Peab, potentially reducing the project time.
ini
Preporsition for bachelor thesis project, working from the inside and out. Emphasising spatial quality and experience, More or less ignoring form and program. I?ve had issues with these aspects in earlier project, the form or the program takes alot of place in the project. I haven?t tried this approach before, it?s an attractive thought to allow the project take a form of it?s own, enclosing those spaces i create.The initial concept was to place the pools on the ground (not digging them into the ground) making them volumes that divide and define spaces.
Optimering av produktionstidsplan : Studie baserad på implementering av ny planeringsteknik i Peab Sverige AB
Now a day?s there is dramatic change from traditional to digital information processing in construction industry. This change can be visualized in the project concept stage where it now has accessibility to join all the data in one place. Location-based planning technique simplifies scheduling by visualizing the schedule efficiently and has many advantages such as might shortened the project period by about 10 - 20 % if the company uses location-based technology, reducing risks in many ways by maintaining production continuity and identify collisions between things etc. Vico Office software has been used for Location based planning technique and in this thesis.The purpose of this thesis work was to demonstrate how location -based planning technology change the scheduling stage in Peab, potentially reducing the project time.
Kostnadsuppföljning avproduktionskalkyler
Calculations are an important part of planning around a construction project. From concept to completion of the project calculation is a tool to try to predict the actual cost. During the production stage in particular, deviations occur which makes the actual cost different from the calculations.This thesis is done in collaboration with JM Residential Stockholm. The study includes a cost follow-up in which a comparison was made between the calculated production cost and actual cost for the five projects. The aim of the study was to observe the most common reasons that a project deviates from the calculated production cost and then summing these causes in a number of categories.
BIM - Förvaltarens Framtid
For nearly twenty years people have been talking about Product models, but given that the building industry is so conservative, it is hard to implement new working methods. Product models are these days known as Building Information Modeling, BIM. People often say they work with BIM but they often forget the most important part, the information. A 3D model should be linked with characteristics and information. Information that can be invaluable for the facility manager.We have a vision that in the best of worlds the facility manager would be able to "walk" into the model and see what kind of installations are inside the wall or in the roof.